Core Service

Waste-to-Energy Gasifier: Supply, Installation & Commissioning

We deliver Enthaltek's Waste-to-Energy gasification technology to Indian sites end to end — from feedstock assessment to a fully commissioned, operating plant.

Overview

Converting Waste Into Usable Energy, On-Site

Waste-to-Energy gasification thermochemically converts municipal, industrial or agro-waste feedstock into syngas, which can be used to generate power or heat — reducing landfill dependency while producing a usable energy output.

As the authorised Indian partner of Enthaltek Sp. z o.o. (Poland), we bring this technology to Indian municipal bodies, industrial waste generators and independent power producers, managing the full project lifecycle.

CircularWaste to Energy Output
Scope of Work

What's Included In Our Service

Feasibility & Feedstock Assessment

Evaluating waste volume, composition and site conditions to confirm technical & commercial viability.

Engineering & Design Coordination

Aligning Enthaltek's gasification engineering with site-specific requirements and statutory norms.

Supply Coordination

Managing procurement and logistics of gasifier systems and associated equipment.

Installation Supervision

On-site supervision of civil, mechanical and electrical installation works.

Commissioning & Performance Testing

System start-up, performance verification and handover documentation.

Training & O&M Support

Operator training and ongoing operations & maintenance support guidance post-commissioning.

Project Process

How a Gasifier Project Moves From Site Visit to Commissioning

1. Site & Feedstock Assessment

We visit and evaluate the waste stream, volumes and site logistics.

2. Technical & Commercial Proposal

A tailored gasifier configuration and project plan, developed with Enthaltek's engineering input.

3. Engineering & Supply

Detailed engineering finalisation and coordinated supply of the gasifier system.

4. Installation

Civil, mechanical and electrical installation under our on-site supervision.

5. Commissioning

System testing, performance validation and formal handover.

6. Operational Support

Training and ongoing support to keep the plant running reliably.

Indicative Technology Snapshot

Waste-to-Energy Gasification at a Glance

Exact configuration depends on feedstock, site conditions and required output — confirmed during feasibility assessment.

ProcessThermochemical gasification of waste feedstock into syngas
Typical FeedstockMunicipal solid waste, agro-residue, select industrial waste streams
Primary OutputSyngas for power generation or thermal/heat applications
Technology OriginEnthaltek Sp. z o.o., Poland
Delivery ScopeSupply, installation & commissioning by Marks Consultancy

Assessing a Waste-to-Energy Opportunity?

Share your site and feedstock details — we'll advise on the right next step.

Start a Feasibility Conversation